Last week we were onsite with EDF Renewables in Tehachapi doing a blade inspection demonstration. With 90km/h peak wind speeds we were lucky not to be blown away. We are happy to say that even though the Senvion MM98s shut down due to the severe wind speeds the Romotioncam was still spinning. Maximum windspeed maximum power…we never stop spinning.
Our new year started off in the best possible way RomotionCam™ on-site with RWE.
RomotionCam™ performs blade inspections while the turbine remains in operation.
RomotionCam™ together with Horus Soluções Verticais completed a 4-week project in Brazil. Thank you to João and his team in Brazil. RomotionCam™ performs blade inspections while the turbine remains in operation.